Mumbai Pune Expressway 2026: Missing Link Opening, New Toll Rates & Speed Camera Rules

The new 180-meter high cable-stayed bridge on the Mumbai Pune Expressway Missing Link Construstion Image.
The new 180-meter high cable-stayed bridge on the Mumbai Pune Expressway Missing Link Status Image.

The 2026 Traveler’s Guide to the Mumbai Pune Expressway

The Mumbai-Pune Expressway has always been the lifeline of Maharashtra, connecting the financial capital to the IT hub. However, for years, the “Ghat section” near Lonavala has been a major bottleneck, especially during the monsoon or peak weekends.

As we move into 2026, the Mumbai Pune Expressway is undergoing its biggest transformation since its inauguration in 2002. From the massive “Missing Link” project to the implementation of high-tech surveillance, here is everything you need to know before you hit the road.

Aerial view of the winding Mumbai Pune Expressway passing through the green Lonavala mountains with moving traffic.

The “Missing Link” Project: Cutting Travel Time by 30 Minutes

If you have ever been stuck in a 2-hour jam at the Lonavala-Khandala ghat, you know the struggle. The Mumbai Pune Expressway missing link opening date is the most searched update this year, and for good reason.

What is the Missing Link?

The MSRDC is constructing a 13.3-km bypass that starts at Khopoli and ends at Kusgaon. This route features Asia’s widest tunnels and a spectacular cable-stayed bridge standing 180 meters high.

  • Opening Date: Scheduled for May 1, 2026.

  • Distance Saved: It shortens the journey by nearly 6 km.

  • Travel Time Reduction: You can expect a Mumbai Pune travel time reduction of 25–30 minutes, making the drive smoother and safer by avoiding the steep curves of the old ghat.

High-speed AI surveillance cameras installed on the Mumbai Pune Expressway to monitor traffic.
Speed Cameras on Mumbai Pune Expressway: Avoiding the AI Fines

Road safety has taken a high-tech turn in 2026. If you think you can speed past a single camera and slow down, think again.

There are now over 430 speed cameras on Mumbai Pune Expressway, including sophisticated AI-powered systems. These aren’t just for “spot speeding”; they use Average Speed Detection. This means the system calculates the time it took you to travel between two points. If you arrive too early, an e-challan is automatically generated.

Key Speed Rules to Remember:

  1. Ghat Section: The speed limit is strictly 60 km/h.

  2. Plain Sections: The limit is 100 km/h for cars.

  3. Lane Discipline: Cameras now detect “lane cutting.” Always stay in the middle or left lane unless overtaking.

Vehicles passing through the Khalapur toll plaza using FASTag on the Mumbai Pune Expressway.
Is Mumbai Pune Expressway Toll Free in 2026?

This is a common question, especially with the new 2026 toll notifications.

For the average petrol or diesel car owner, the answer is no. Is Mumbai Pune Expressway toll free? Only if you drive a Pure Electric Vehicle (EV). Under the Maharashtra Electric Vehicle Policy 2025, pure EVs are currently exempt from tolls on the Expressway and the Atal Setu.

Current Toll Rates for Cars (One-Way):

  • Cars/LMVs: ₹320 (Expected to see a minor hike after April 1, 2026).

  • FASTag is Mandatory: If your FASTag is not functional, you will be charged double the toll amount in cash.

Navigating with the New Mumbai Pune Expressway Map

With the opening of the Missing Link, the Mumbai Pune Expressway map is changing. The new 8-lane corridor will take you through two massive tunnels, bypassing the local Lonavala traffic entirely.

If you are a tourist looking to visit Lonavala, you will still use the existing “Ghat” exit. However, for those heading straight to Pune or the Mumbai Airport, the “Missing Link” will be the primary, non-stop route.

Final Travel Tips for 2026
  • Check Status: Before leaving, check if the Mumbai Pune Expressway is open, especially during July-August, as heavy rains can occasionally lead to precautionary closures in the old sections.

  • Tire Pressure: High-speed driving on concrete roads generates immense heat. Ensure your tires are in top condition to avoid bursts.

  • Fuel/Charging: While there are plenty of food malls, ensure you have enough fuel/charge before entering the “Missing Link” tunnels, as there are no exits for 13 km.

6. FAQ Section

1. What is the latest update on the Mumbai Pune Expressway Missing Link? The project is 95% complete. It features two tunnels and a massive viaduct. It is expected to open to the public on Maharashtra Day, May 1, 2026, significantly easing the Lonavala bottleneck.

2. How much is the fine for overspeeding on the Expressway? Fines for overspeeding start from ₹1,000 to ₹4,000 depending on the speed. Repeated offenses can also lead to a temporary suspension of your driving license.

3. Are there enough EV charging stations on the route? Yes, almost all major food malls (like Khalapur and Talegaon) now feature high-speed DC fast chargers to support the growing number of EVs on this route.

4. Can I use the Missing Link to go to Lonavala? No. The Missing Link is designed as a bypass for through-traffic. To enter Lonavala or Khandala, you must use the traditional ghat road and the existing exits.

5. Is the Expressway safe during the monsoon? While the new tunnels in the Missing Link are designed for all-weather safety, the old ghat section remains prone to landslides. Always check official MSRDC social media handles for “is Mumbai Pune Expressway open” updates during heavy rain.

6. Does the toll price include the return journey? No, the toll is charged per trip. However, you can check for “return journey” discounts on your FASTag if you return within 24 hours.